Saturday, August 10, 2013

Day-139: Carpentry Completed and Much More...

As per the update from the SM, the following things are done in the last two weeks:

  • Looks like the carpentry is almost complete. Kitchen, Loundry, Pantry areas are all done. All the doors are installed and so are the sliding doors. 
  • One coat of painting has been done on the ceiling and the primer  has been done on the walls all around inside the house. 
  • Waterproofing in all the baths and the balcony has been done as well.
  • Rain tanks installed as well

Next week there will be work on the following:

  • Benchtops in Kitchen, Loundry, Pantry, baths
  • Tiling in the baths (there will be quite some work out there as there are five baths)
  • We were told by the SM that there was some issue with the Firelace height which would be rectified in the coming week as well.
  • More painting...
  • Also, we have requested our SM to get the downpipes done as otherwise when it rains, the water rushes to the neighbour's property. Hopefully this will be rectified this week.
I have sent the measurements of all our appliances to our SM to make sure that all of them will fit into  their respective places.

In the meantime, we have been sent the invoice for the FIXING STAGE. So hopefully the momentum of the work will be on...

We have started meeting people for driveway, fence, gates etc... The good thing is that we have got people's recommendation which has made our life easier as we do not need to hunt people around.
Perhaps it is too early, but within a month we need to gear up our efforts on this so that we could get these things done as soon as we are handed over the keys.