Day-26: Hydraulics/Pipes are Done...
On 16th April, all the drainage pipes were laid and a pit in the front of the house was installed as well. The sewage pipe to the back of the house easement was also connected. Last time we had some issue with the connection to the easement and I wonder that is resolved because of the new PVC pipe connection. I could not locate the front connection to the street rain storm water drain system. There is a road opening application which has been already approved. I wonder when that would be done soon as well.
It has been raining too much and I can see that the progress is a bit curtailed this way. In April out of 30 days the prediction is that it will rain almost 23 days. Isn't that too much rain?