We had a call from the SM and were advised that the project is on schedule and that various inspections are being organised. The first will be the inspection from Metricon. Then will follow the inspection from the Council. These will happen in the two coming weeks. Around the first week of Oct we will get a chance to inspect the house and then when we get the Interim-Occupation Certificate from the Council we could move into the house. Obviously we need to get our landscaping and driveway done.
As per our SM, the following has been done:
- Tiling and bathroom accessories installation have been done in all the bathrooms
- Spa has been installed
- Electrical are all done
- Plumbing on the downpipes on the both sides of the house has been done
- Painting on the Portico done
- General cleanup done for the building materials
- Cupboards installation done
- Fireplace installation done
The following will be done in this week:
- Toilet shower screens
- Whirleybird
- Appliances installation (may be a bit later...)
- Flooring, wooden, tiles and the carpeting.
- Outside painting
- Another round of cleanup inside and outside (Our SM has assured us that the tree roots sitting in the front will be cleaned as well in the final cleanup.)